Victron energy VE.Net DC Manual de usuario Pagina 8

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 16
  • Tabla de contenidos
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 7
8
Battery Monitor
12.1V 0.0A 99%
DC Voltage
12.10V
Setup Controller
[Press Enter]
Battery Capacity
200Ah
Figure 1
2.3 Setup
When the VE.Net Battery Controller is connected to a VE.Net panel, the panel is powered through
the UTP (Unshielded Twisted Pair) cable.
Step 1.) Hold “Enter” for 2 seconds to power up the VE.Net Panel. After the panel has started with
only the VE.Net Battery Controller connected the screen will display:
The first line shows the name of the connected device, the second line
shows the quick status.
Step 2.) Pres “Enter” to enter the Battery Controller menu.
Step 3.) Press “” to scroll through the menu until you see “Setup Controller”.
Step 4.) Press “Enter” to enter the Setup Controller menu.
Make sure that you first connect the system
before placing the 1Amp inline fuse!
You should never connect other devices or
wires to the shunt!
First read the Safety Precautions in
paragraph 1.4
Battery positive
(Load)
Battery
nega
(System ground)
Vista de pagina 7
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

Comentarios a estos manuales

Sin comentarios