Victron energy VE.Net DC Manual de usuario Pagina 5

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 20
  • Tabla de contenidos
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 4
-4-
2 Installation of your VGM
To install your generator module you will need:
VE.Net Generator Module (supplied)
A.C. sensor box with 20 amp load shed contactor (supplied)
2 meter RJ11 cable (supplied)
VE.Net panel
Standard straight UTP cable
2.1 Wiring – A.C.
Single-phase generators rated up to 20A (approximately 5.7kW @ 230V and 3.0kW @ 120V) can
use the supplied load shed contactor built into the AC sensor box (use Figure 2-1 – A.C. sensor
box using the internal contactor).
Figure 2-1 – A.C. sensor box using the internal contactor
Single-phase generators rated up to 100A (approximately 23kW @ 230V and 12.0kW @ 120V)
have to fit an external load shed contactor, but can still use the standard sensor box for monitoring
of voltage, frequency and current (use Figure 2-2 – A.C. sensor box using an external contactor).
Vista de pagina 4
1 2 3 4 5 6 7 8 9 10 ... 19 20

Comentarios a estos manuales

Sin comentarios